The Installation of Solar Panels

Phase One:

Solar panels with a capacity of 2.6 MW have been implemented through the Arab Organization for Industrialization, aimed at reducing electricity consumption from the national grid or internal generators. The total investment cost for the supply and installation of the stations amounts to EGP88.32 million. The current execution progress stands at 90%.

 

Phase Two:

The procedures for tendering the second phase of the project with a capacity of approximately 2.5–3 MW are underway. Potential companies are conducting site visits to assess the required land areas and electrical interconnection points, with the aim maximizing the utilization of the project’s design capacity.