Implementation of a Steam Optimization System at Abu Qir (1) Ammonia Plant

The project proposed by ABB aims to enhance steam consumption efficiency, which in turn will reduce natural gas consumption as boiler fuel by approximately 2–4%. The project’s total investment cost is estimated at USD 500,000, with an implementation period of 7–8 months.