مشروع الإحلال الجزئي للغاز الطبيعي بالهيدروجين

Partial Replacement of Natural Gas with Hydrogen

The project aims to increase the production capacity of Abu Qir (1) Ammonia Plant from 1,100 tons/day to 1,200 tons/day,

...
Implementation of a Steam Optimization System at Abu Qir (1) Ammonia Plant

Implementation of a Steam Optimization System at Abu Qir (1) Ammonia Plant

The project proposed by ABB aims to enhance steam consumption efficiency, which in turn will reduce natural gas consumption as

...
The Installation of Solar Panels

The Installation of Solar Panels

Phase One: Solar panels with a capacity of 2.6 MW have been implemented through the Arab Organization for Industrialization, aimed

...